Installation Supplies Needed

  • Zip ties for cable management

  • Extra ¼ – 20 hardware (nuts, bolts, washers)

  • Laptop/tablet with an ethernet cable for any required programming updates/changes

  • 3/8” split loom for camera and solar cables at the panel with ¾” x 10’ of seal tight

  • Cable pass-through glands (If not already installed on Battery Box)

  • Extra metal hose clamp ties (banding straps)

© 2024 Vetted Security Solutions LLC a Vetted Holdings Company.