ALPR Pole Pre Installation Tips

< 1 min read

Table of Contents

Prior to the start of labor: #

  • Acquire site/pole location from PO or supervisor.
    • Determine if there is an existing pole, or if one will be added to this location.
  • Verify the job requirements and the number of resources needed.
  • Verify dimensions of poles and mounting equipment.
  • Determine the required solar panel angle for maximum power production and if facing the panels to the south will work in the desired location.
  • Inspect the ALPR pole for damage and ensure it is correctly implanted into the ground.
  • Verify that the required tools (including ladders, bucket trucks, or other heavy equipment) are present and can be used to complete the job.
  • Estimate the amount of time the labor will take.