Customer Responsibilities – Providing Power

Suppose equipment is connected to an existing AC environment, and the requirement outlined in the site survey connects to existing customer-supplied AC power. In that case, it is the customer’s responsibility to ensure that existing 120-240VAC CONSTANT HOT power is available at the pole.

 

A block diagram of power connections to the Power Supply located in the Intelligent AC Enclosure series is below:

image-20220906-155254.pngimage-20220906-155318.pngimage-20220906-155340.png

© 2024 Vetted Security Solutions LLC a Vetted Holdings Company.