Panel, Battery Box, and Camera Installation Parts

Solar Panel Installation Parts #

  • Solar Panel(s) at correct rated wattage
  • Solar Panel frame/carrier with required hardware
  • T-top pole mount at correct diameter for pole (If the panel is top mounted)
  • Side mounting brackets and hardware (If the panel is mounted on side of the pole)
  • Cross-through pole that mounts through T-top
  • Hardware and U-style bolts with saddle clamps for the cross-through pole
  • Y connectors with weatherproof male and female ends that match the solar panel connectors
  • 10AWG wire at proper length (<30’) to run from solar connectors to Battery Box
  • Correct size crimp connectors to connect the wire to Battery Box

Battery Box Installation Parts #

  • Fixed tray with legible ID label that has passed QC inspection and gone through burn-in
  • Battery Box enclosure with the required hardware for pole mounting to include U-brackets
  • Straps to position the box to pole and hold the box in place for mounting
  • Victron solar charge controller at proper rating
  • GPS/LTE antenna (Attached to the enclosure)
  • (2) 12v or 24v lithium batteries (ensure there is terminal hardware with each)
  • 10AWG wires and (6) yellow 5/16” ring crimp connectors for battery installation
  • Active SIM card
  • 24v fan
  • Metal hose clamp ties (banding straps)
  • (2) ¾” cable pass-through glands
  • V.E. Direct cable that goes from solar charger to USB for PC

Camera Installation Parts #

  • Correct cameras that have been configured
  • Proper length camera cables
  • Ram balls (to match qty of cameras)
  • Camera mounting brackets with C-clamp attachments and hardware
  • Camera sun shrouds (to match qty of cameras)

image-20220720-223118.pngimage-20220720-223136.pngimage-20220720-223210.pngimage-20220720-223327.png

© 2024 Vetted Security Solutions LLC a Vetted Holdings Company.